I’ve already bought all my lumber for the deck, i went with 2x12s since that’s what my sub floor wasi wasn’t thinking that I need drop the ledger 2 or… I’ve already bought all my lumber for the deck, i went with 2x12s since that’s what my sub floor wasi wasn’t thinking that I need drop the ledger 2 or…Read MoreGreenBuildingAdvisor
Recent Comments